FEES & CHARGES
Sewer Service Charges Effective: January 1, 2024
Residential
Low Income Street Lights Multi-Family Commercial Late Charge NSF/Returned Cks Lien Filing Fee Duplicate Bill Final Bill Fee |
$50.00 /month, billed bi-monthly - flat rate
$24.50 /month, billed bi-monthly - flat rate $2.70 /month, billed bi-monthly - flat rate $50.00 /month per unit, billed bi-monthly flat rate $50.00 /month for 1st 750 cu.ft water used, and $6.50 /month per each 100 cu. ft. beyond 1st 750 cu. ft. 10% fee charged for bill not paid in full be end of the month following the period shown. $20.00 per item $125.00 $0.50/month, billed bi-monthly - flat rate $25.00 per closing |
Permit Fees
Residential
Commercial Interceptor Multi-Family Mixed Use Facility Special Permit Repair Repair over 20ft Capping Right-of-Way |
$ 120.00 (New Construction, re-routing of side sewer, adding footage, bathroom or trailer dump, or new building connections to existing side sewer). Includes 2
inspections, additional inspections $50.00 each. $ .02/sq. ft. of floor space - $ 240.00 minimum. Includes 2 inspections, additional inspections $50.00 each. $ 150.00 Includes 3 inspections. $ 150.00 first unit, plus $ 20.00 for each additional unit $ 300.00 $ 250.00 Weekend overtime $ 50.00 $ 100.00 $ 100.00 $ 550.00 |
Certificates of Availability $ 25.00
General Facility Charges
Effective March 1st, 2024
Residential
Multi-Family Commercial 5/8" x 3/4" 1" 1 1/2" 2" 3" 4" 5" 6" 8" |
$5,252.00 (Single Family Unit)
$4,202.00 per Unit (Based on size of water meter) $5,252.00 $13,130.00 $26,260.00 $42,016.00 $84,032.00 $131,301.00 $183,821.00 $262,601.00 $420,162.00 |
Connection Charges
(Local Facilities) Calculated based on Cost of Construction to Serve Property
To be determined prior to construction.
Developer Extension Fees
$500.00 Application Fee – applied towards actual costs for Engineering, Legal Expenses, Permits and Administrative Charges, etc.
Recording of Easements, or contracts
$209.00 for first page, $1.00 for each additional page
Lien Release - $18.00 for first page, $1.00 for each additional page
Vactor Waste Dumping - $25.00 each
(Local Facilities) Calculated based on Cost of Construction to Serve Property
To be determined prior to construction.
Developer Extension Fees
$500.00 Application Fee – applied towards actual costs for Engineering, Legal Expenses, Permits and Administrative Charges, etc.
Recording of Easements, or contracts
$209.00 for first page, $1.00 for each additional page
Lien Release - $18.00 for first page, $1.00 for each additional page
Vactor Waste Dumping - $25.00 each
Copies
Regular Bond Copies
Digital Prints Comprehensive Plans As Builts, “White Cards” or Copies of Original permits |
$.15/each
$ 3.75/each $ 60.00 deposit (Refunded on Return) No Charge |